Showing posts with label railways. Show all posts
Showing posts with label railways. Show all posts

Wednesday, May 16, 2012

Lobbies and lazy journalism

Crisis: Queues at Heathrow Terminal 5 today
Here's a great example of lobbies taking over column inches, in this case on a subject that's close to my heart:
David Cameron told: Act now to save Heathrow Airport - Transport - News - Evening Standard

Prime example of lazy "journalism", writing up a quick piece straight off the press pack from BAA. Any proper newspaper article would have tried to show both sides of the story, with counterpoints.

I hope Jonathan and Lucy enjoyed a really nice lunch paid for by Ferrovial (BAA's Spanish owner) and a few nice gifts too.

Just a reminder to set the record straight, London has FIVE international airport (actually, now SEVEN if you count Manston and Southend), totalling seven runways (not including the unused backup one at Gatwick), most being under-used. Heathrow is a WWII planning mistake, its flight path goes over 2m people. Those five airports handle over 130 millions passengers on their six runways, about 150% of the traffic in Paris (LHR + CDG).

It's about time we stop comparing LHR to other European cities and instead do what they've done: build a new airport with enough room for expansion. If it needs to be in the Thames estuary, so be it. 

Previous posts on the same subject:

Wednesday, February 09, 2011

Curing the symptoms: plod in a van at the level crossing

After realising red  light jumping at levels crossing is rife and having established that people running in front of trains isn't exactly the best for health and safety statistics, Network Rail has shelled out £60k on a high-tech camera van. 
The sixty grand mobile enforcement control room comes complete with PC Chris Sheppard watching herds of commuters and vehicules running across the railway as light flashes.

Check this video, mostly filmed at Mortlake station (the van is parked on a double yellow line..): BBC: New spy camera to check level crossings.

It's worth pointing out that the Sheen lane crossing does have a pedestrian bridge, allowing school children to cross instead of running across unlike at North Sheen station.

My take on this? Once more, they're trying to cure the symptoms rather than tackling the issue. Which is quite simply that a level crossing on a busy line (translate: closed for 15+ mn at a time) is archaic in a densely populated connurbation. The line should be buried or a tunnel dig, or else. 
 
Final thought: the story doesn't say if the plod-van comes with a toilet?

Thursday, December 02, 2010

BBC - Mind The Gap: Why do south London trains suffer most in the snow?

BBC - Mind The Gap: Why do south London trains suffer most in the snow?

Another proof that our transport system is antiquated and no longuer fit for purpose:
In south London the companies like Southern Railway, Southeastern and South West Trains have to operate using the "third rail system".That is, the electricity is transmitted to the train using an electrified third rail that the train picks up through a bit of metal called a shoe. So, while Network Rail have been running "ghost trains" (empty trains) and de-icing trains through the night there comes a point when it doesn't help.
When the snow and ice hits, if the conductor third rail is cold as soon as snow hits it, it freezes.





, , , , , , , , ,

Friday, November 05, 2010

Giving up infrastructure is rarely a good deal for users and tax payers

Read this am: BBC News - High-speed rail link London to Folkestone is sold

Since it cost GBP 5bn and was sold for 2.1b, I'm failing to see where's the "great news for tax payers and rail users". For the latter, the failure of British Rail privatisation and of the tube PPP maintenance contracts clearly shows that selling out transportation infrastructure is a dodgy bet for the least.
When it works, it usually means giving private companies a nice little monopoly and a steady cash flow -take the French privatisation of motorways for instance, where more is going to share holders and less to building of new roads (which was incidentally the excuse in the first place for instoring tolls on those autoroutes).
But usually it doesn't work, and either companies end up bust with taxpayer having to mop up the collateral damage. Think the great

Plus relinquishing a tool to boost a nation's economy and litterally shape a nation fabric is neither a good news for users. Prove me wrong...




, , , , , ,

Tuesday, November 02, 2010

Waterloo: more Boris Bikes but still no sign of life for the Eurostar old platforms

1009_waterloo.jpgTwo good posts this week on Londonist.
  • The first one is on the continuing mystery of the old Eurostar platforms and why they cost £4.1 to keep in mothball state -quite a good example for a pathetic failure on behalf of people in charge of the nation's rail infrastructure. It's especially enraging when you're waiting on the approach to the station in a commuter train for a platform...  I've blogged before about this, see links below.
  • And it looks like TfL has heard about my winging on Boris Bike stations being located far away from stations: Huge New Cycle Hire Station For Waterloo.  Shame common sense did not prevail in the first place, I still wonder why they looked at Montreal rather than Paris for municipal cycle hire best practices...

See my previous posts on those subjects:





, , , , , , , , , , , , , , , , , ,

Monday, October 11, 2010

North Sheen level crossing: don't miss the public meeting on the 21st

As posted todat on the Facebook group: Stuck at North Sheen Level Crossing, there will be a public meeting about the level crossing with Zac Goldsmith, Network Rail and local councillors at DUKE STREET CHURCH in DUKE STREET, RICHMOND on THURSDAY 21st OCTOBER at 7.30pm. Bring your tales of misery and woe!

See my previous posts on the level crossings:


  • Near miss at North Sheen level crossing




  • Some news on the level crossing: consultation next Thursday!



  • At last: the North Sheen footbridge is coming... alas, this is not what you expected!



  • Richmond Transits: Join the Facebook group "Stuck at North Sheen



  • Richmond Transits: Airtrack and North Sheen Crossing


  • Richmond Transits: Monday Mayhem at North Sheen level crossing




  • Richmond Transits: Update on the North Sheen station footbridge




  • Richmond Transits: Here's the new camera at North Sheen level crossing




  • Richmond Transits: Update on the update on the North Sheen station




  • Richmond Transits: Susan Kramer's progress on North Sheen Station





  • Richmond Transits: Another train tragedy in waiting at North





  • Richmond Transits: Still waiting at the level crossing...





  • Traffic pandemonium: just a sign of things to come?




  • More on Manor road and Heathrow



  • Richmond Transits: Level crossing tragedy in Barnes



  • Richmond Transits: Update on the North Sheen station footbridge



  • Richmond Transits: Preliminary plans for North Sheen footbridge rebuffed




  • Richmond Transits: Campaing for suppressing level crossings




  • Richmond Transits: Richmond and Twickenham Times: Commuters see red over level crossing




  • Richmond Transits: Susan Kramer's progress on North Sheen Station footbridge




  • Richmond Transits: Time to remind Susan Kramer about the North Sheen Station footbridge



  • Recommended reading:

    Tags:, , , , , , , , , ,

    Monday, March 15, 2010

    Join the Facebook group "Stuck at North Sheen level crossing"

    Just join:
    Facebook | Stuck at North Sheen Level Crossing
    See my previous posts on the level crossings and the footbridge...

    Do also check this BBC News footage, partly filmed at North Sheen:
    As far as I am concerned, it's all too easy for Network Rail to accuse people to be careless when a level crossing is down for up to 15 mn at the time and is located in a densely populated area.

    North Sheen level crossing belongs to a long bygone area and the line should be running in a covered trench at this place, leaving space for a commuters bicycle park and a more modern station for instance.



    , , , , , , ,

    Friday, March 12, 2010

    Still waiting at the level crossing...

    At the North Sheen station / Manor road this morning.

    I'm not sure I understand the ambulance crew logic: if it's urgent, why go through a level crossing? If it's not, why the flashing lights?

    Anyhow, just another life level crossings cost lives (and a reminder we're waiting for that footbridge promised by Susan Kramer MP)

    See my previous posts on the level crossings.

    Thursday, February 04, 2010

    I could not say it better

    Saw the quote below in INTERVIEW: The Man in Seat 61... - Londonist:
    seat61.2.jpgIf you had a magic wand, what one thing would you do to improve London’s current transport problems?
    We urgently need Crossrail, and Thameslink 2000 (or is it 3000 by now?). Like the RER in Paris, this will bring suburban trains right through the centre of the city and out the other side, relieving the Underground and for many passengers, avoiding the need to switch from train to Tube at all. But whereas other countries seem to plan ahead, we Brits prefer things to reach crisis point before we do anything.




    , , , , ,

    Tuesday, January 05, 2010

    Integrated transport anyone?

    Tower BridgeOne of the most frustrating aspects of the transport system in London, apart from its high-cost (busses went from 70p to an eye watering £2 in just a few years) and unreliablility, is the lack of integration. There are many examples -just look at a tube map to see where rail stations don't connect with the tube, like in Putney for instance: that one is quite frustrating as both lines actually intersect but instead of building an interchange above the train line, commuters have get out of the station and walk 200 feet. Or, why is the Waterloo & City line not extended to Moorgate and then through using National Rail tracks? And South?

    Some things are improving though: from yesterday, the Oyster card is accepted on National Rail (except to Heathrow, etc). At last you may say...

    There's some more scope for improvement though. For instance, this Evening Standard column suggests using the Thames a proper highway.

    In under three years, and for an initial outlay of just £30 million, we can create a new, waterborne Tube line, with a frequent service of high-speed boats at 20 piers from Putney to Woolwich. That is about a quarter of the time, and less than a hundredth of the money, that a similar project would need on land.
    Would Boris dare?





    , , , , , , , ,

    Wednesday, September 09, 2009

    Bring on High Speed Two, not more runways

    rail planRegular readers will know I think high-speed rail is a necessity. Today, on BBC.com there was an interesting statistic in this news article: Cities urge high-speed rail lin

    Over 60 years, it is estimated that the line could save 30 million tonnes (29.5m tons) of CO2 worth £3.2bn by diverting passengers from air travel to rail.

    Although 60 years can seem a very long time, rail infrastructure is ammortised over long periods. The real saving could be that a proper high-speed rail (HSR) network could avoid building more runways around London. I'm sure BAA thinks differently, but it worked just like that in France where TGV has displaced air travel on routes such as Paris to Nantes, Lyons, and even Marseilles.

    Will this happen in the UK? I'm sceptical it will happen quickly, mostly because of the lack of proper planning, decentralised decision making and short-term focus.



    , , , , , , , , ,

    Wednesday, August 26, 2009

    Is Britain about to jump on the high speed bandwagon?

    UK rail mapVery exciting news today: BBC NEWS | Business | New high-speed rail plan unveiled

    At long last, Network Rail has made a proposal for a second high speed line to link London to the Midlands and further North.
    I do hope sincerely it's more than just talk, as high speed train is the best way to curb air pollution and give this country the transportation infrastructure it badly needs.
    France had embarked in such a programme 25 years ago, and now train has the lion share in passenger numbers between Paris and London, Lyons, Marseilles, Nantes and even Bordeaux.

    With Edinburgh only 2 hours from London, who needs to endure the hassle of flying?
    And there's probably no need to expand airport capacity in London...

    Unfortunately, it won't be before 2020...




    , , , , , , , ,

    Tuesday, August 25, 2009

    I could not agree more with Jon!

    Saw this post, not much to add bar that he's got a rationale explanation for the tragic short sight that's affecting people in charge of our transport networks:

    RER at Châtelet-Les Halles, CC / Flickr
    Jon Worth » Crossrail and multi level governance
    Second, why, oh why, would anyone seriously want to oppose Crossrail as Next Left alleges that Cameron does? OK, the line does not serve too many Tory constituencies, but London is projected to grow over the next few decades and the London transport network is already horribly saturated. Why can we not even manage to get behind one high speed, high capacity line? After all Paris has just five similar lines (RER), each with 10 carriage trains, some of them even double-decker. The hub station alone – Châtelet-Les Halles – handles almost half a million passengers a day on its RER platforms. Anyone who has ever tried to take the Central Line at peak times must clearly see that more east-west capacity is vital.




    , , , , , ,

    Wednesday, July 15, 2009

    A commuter's week...

    This week, I'm wondering why we have to make do with third world infrastructures? Of course, we should have adequate sewage systems. Of course, we should not have level crossings in densely populated areas.

    Monday: storm causes sewer discharge in Thames -900 thousand tonnes it seems.

    Tuesday: the BCC pushes a reoport saying Heathrow must be expanded to add £30b to the economy. For me, I'm very sceptical of those hair raising figures pushed by the aviation lobby: "John Stewart, chairman of campaign group Hacan, argued that the report contradicted previous findings, saying the Government’s own figures suggested the benefits to the economy would be £5bn over 70 years."

    Nothing about the indirect costs of course, no mention of alternatives such as shutting down 2, 3 or 4 airports around London to move them in the Estuary or developping high speed trains.

    See my other posts on LHR Expansion.

    The scene at the level crossing last weekWednesday: train delayed because of incident at the White Hart Lane level crossing. Just like the one reported here:
    Sheen Lane crossing most misused in Britain (From Richmond and Twickenham Times)

    While I'm on about the level crossing, we may eventually get a level crossing in North Sheen -I've been campaigning for years and lobbying MP Susan Kramer. Not before 2010 it seems though....

    In the meantime, schoolchildren will probably continue to jump it.

    Still on about level crossings, our MP's met with Network rail, but with little results it seems.

    See my previous posts on the level crossings.




    , , , , , , , , , , , , ,

    Monday, May 11, 2009

    Are high-speed trains viable in the US?

    Interesting article here:
    tripso.com | Are high-speed trains viable in the U.S.?

    Certainly thought provoquing in a country where "high-speed trains" mean 150 mph only.

    Here are the comments I've posted.

    To me, there are a few truths:
    - Rail is less polluting in general (it takes less energy to move something on iron-to-iron railways), even more so if lines are electrified and electricity comes from renewables or nuclear

    -  Rail competes with air easily for distances less than 1000 km / 600 miles

    - The city-centre to city-centre networks work well in dense connurbations with adequate public transport between the city centre and suburbs. When megapolis have no centre, advantages are less obvious.

    - For the end-user, convenience/speed and price must be right, unlike in the UK where people choose cars because public transport fails them, despite congestion and high cost of the personal convenience called "car".

    - Railways are never going to turn up a profit, they need subsidies and have to be built upon long periods to become alternatives to automobiles. Just like roads and street lighting. Of course, single lines can be profitable under some cicumstances, but it's missing the point about the advantage of an integrated public transport network.




    , , , , ,

    Thursday, May 07, 2009

    Time to nationalise the trains?

    Library file photo dated 12/12/2004 of two Midland Mainline trains at Kings Cross St Pancras, London. Transport group National Express said today it had exceeded expectations for this year after strong performances at its coach and bus businesses. PRESS ASSOCIATION Photo. Issue date: Monday December 18, 2006. Shares in the group, which runs rail services including Midland Mainline and Central Trains, rose 2% as it told investors that it had ended 2006 strongly.Read in The Times this am:
    National Express wants taxpayers’ cash to keep running East Coast trains - Times Online

    At a time where rail fares have been increasing faster than inflation, I was reading this and thinking it was a further proof that the rail privatisation did not work, in the UK or anywhere else.

    Its results are:
    • a poor deal for the consumer with one of the most expensive transport system in the world, sending more people than ever on the roads (an overused infrastructure with little investment over the last 20 years)
    • little progress in upgrading and investments, with for instance no high-speed links between London, the Midlands and Scotland ; I mean Crossrail and HS1 are not much in 20 years
    • overall, the service is sort of improving but is running on many lines over-capacity 
    In the meantime, the government continues with its double standards and taxes cars CO2 emissions while not taxing aviation fuel and not phasing out diesel train engines with electrified lines.




    , , , ,

    Thursday, January 08, 2009

    What if those who govern us had a long term view about strategic infrastructures?

    I posted the following comments on this blog post of this morning:
    The Toleration Of Public Transport on Jonathan MacDonald.com

    These are the consequences of the refusal to invest in a proper public transportation system for 30 years: high prices and bad service.

    They've tried to privatise and introduce competition, but the idea just doesn't work with infrastructure: you just can't make a profit, provide universal access, good interconnections and good service with redundant infrastructure.

    If the government had taken a long term approach, the results could be:
    - that the Eurostar platforms don't stand un-used for a year after they've innaugurated High Speed 1 and St Pancras International, when on the other hand trains are waiting for a platform on approach to Waterloo station
    - that the Waterloo and City line would not be an isolated branch but would serve as a junction tunnel between the overground in Waterloo to the overground in Moorgate (strange that no one ever thought that trains could come from Reading / Portsmouth all the way to Stevenage / Cambridge)
    - an airport in the estuary with 5 runways instead of 5 airports in dense conurbations, each with 1 or 2 runways
    - a high-speed line to the Midlands and Scotland, with an interchange with the Eurostar
    - Water pipes that are buried so that they don't freeze when the temperature drops

    And so on... it's a long story of incompetence and short-sighted decisions.


    , , , , , , , , ,

    Monday, January 05, 2009

    Thursday, December 04, 2008

    More on Manor road and Heathrow

    Seems now the government is embarrassed:

    Decision on third runway delayed(BBC.co.uk)























    "Anti-Heathrow expansion campaigners claim the government is stalling"

    "A decision on whether a third runway
    should be built at Heathrow Airport has been put back to January 2009,
    the Department for Transport has said.
    "


    And also, the impact of the Airtrack on local level crossing is making into national news:




    BBC NEWS | England | London | Rail link 'may cause longer wait'


    Read also my previous post: Airtrack and North Sheen Crossing


    , , , , , , , , , , , , , , , ,

    Monday, November 17, 2008

    Airtrack and North Sheen Crossing

    I picked up last week a flyer from the LibDems at North Sheen station, to read that at my great pleasure Susan Kramer has obtained that the footbridge to the South side of the track will be rebuilt.

    This is not only a practical issue, as with the new train schedules the level crossing in Manor road is down a a lot (read in the RTT: Level crossing bottlenecks choking Richmond, apparently it could be 75% of the time in the future!) it is also a safety issue. Indeed, I'm glad to get someone chiming in on something I've raised over two years ago:

    Assembly member Caroline Pidgeon discussed safety concerns to pedestrians brought about by the delays.She said: “People get so frustrated waiting for the barriers thatsome have been tempted to go round them and run across the tracks.“Children have been seen doing this and it’s just an accident waiting to happen.”

    It's also unfair for local residents: we get all the congestion but only four trains per hour at peak time. At least, we should get four trains per hour off-peak as well.

    (plus, let's fine stationary cars too: Stuck at a level crossing? Turn off the engine or pay £20 fine - The Times)

    What's the link with this and Airtrack, the plan to improve Heathrow's access by rail? At first sight, it looks like a good idea, and I am always supportive for better public transport.

    However, it's hard to read without being suspicious of BAA's intentions, here's my take:

    1. BAA and BA build a new terminal in Heathrow (despite massive local opposition, read on BBC.com: Heathrow runway debate a 'sham'), claiming it's vital for the economy (without supporting this with any proof) and despite London being served by 4 other airports...
    2. Oh, shoot, access to Heathrow by public transport isn't that good and, as opposed to what's going on the continent, there's no high-speed rail link.
    3. And, bugger, if they extend the airport, they won't meet the new EU emission criteria, even with BAA's imaginary green’ jumbo (The Times).
    4. Easy: they just improve the public transport and create a car-free zone around the airport.
    5. Expensive? Not really, they say let's just extend the existing train lines, charge more for parking and create a road tax on the model of Red Ken's London Congestion Charge.
    The snag? The train network, for not having received significant investments in the last 30 years, is completely saturated in the South East of England. And those trains to Heathrow, they will have to run somewhere. Like through Richmond...

    This is why I oppose Airtrack, unless they actually invest significantly to increase rail capacity: North Sheen should be buried underground, a car park created on top to encourage people to park and take the train and we should see 8 trains an hour.

    You can make your views heard on Thursday


    Read my other posts on the North Sheen footbridge and those on Heathrow Expansion.

    And also: MPs attack Airtrack (RTT)


    Tags: , , , , , , , , , , , , , , ,